First Ground

Wasteshed screening

Pick a location and options. The map gathers supply, competitors, and transfer paths, then draws catchments that feed the site.

Concentric wasteshed rings around a facility pin

Three views of the same site

Reach

Where material can physically travel under your haul assumptions.

Commitment

Where contracts and franchise rights already bind tonnes.

Practice

What tip and acceptance patterns allow in the operating period.

On the inspector

Scoring detail stays inside Atlas Pro. This page is the public picture of the workflow.

Watch wasteshed walkthrough Methodology Notify me