Home / Directory / Wisconsin / UW Oshkosh Biodigester
Key facts
- Operator
- University of Wisconsin Oshkosh
- Process
- Anaerobic Digestion
- Type
- Anaerobic Digestion
- Status
- Location
- Oshkosh, WI, US
- Address
- 755 Dempsey Trail
- Last updated
- 2026-10-02
Sources and provenance
- Related article
- BIOFerm FERMITIGO Oshkosh Case Study
First Ground aggregates public agency and registry data. Status badges describe our editorial review of registry data.
UW Oshkosh Biodigester
Unverified location
Coordinates come from a public agency or registry feed. Field verification of siting at this pin is pending.
Satellite imagery and agency/operator source check, Oct 2026.
Location
Related
Vendors and partners
Public-source vendor and partner roles cited on this facility record.
-
BIOFerm Energy Systems
· Technology supplier
Source: Oshkosh case study, BioFerm Energy
Planning a site near here?
Request a wasteshed study: catchment screening, feedstock tonnage, competing facilities, Huff market-share siting, and permit or filing context for Wisconsin.
Equipment vendor entering Canada?
First Ground helps AD, compost, and RNG equipment vendors navigate CSA requirements, distributor strategy, and Canadian market entry without setting up a local entity first.
Suggest an edit to this record
Corrections are reviewed before publication. Include a source URL or document.